
Filled Clean out |

Empty 16 Gallon Shop Vac |

After Cleaning Out Clean out |

Cyclone w/system off-debris |

After Vacuumed out |

After Tapping Filter |

30 Gallon Bin |

CV1800 Closet (under Construction/outside of shop) |

Main Line outside of shop |

Main Line & 1st Branch outside of shop |

1st Outlet Router Table |

Main Line Inside Shop |

2nd & 3rd Drops |

Sawstop Connection |

Sawstop Connection Closeup |

4th & 5th Drops (Wye & pipe not extended yet) |

End of Run Capped (waiting on Miter Station build w/planner stand, 2connections wyed) |
| |
| |
| |