Filled Clean out |
Empty 16 Gallon Shop Vac |
After Cleaning Out Clean out |
Cyclone w/system off-debris |
After Vacuumed out |
After Tapping Filter |
30 Gallon Bin |
CV1800 Closet (under Construction/outside of shop) |
Main Line outside of shop |
Main Line & 1st Branch outside of shop |
1st Outlet Router Table |
Main Line Inside Shop |
2nd & 3rd Drops |
Sawstop Connection |
Sawstop Connection Closeup |
4th & 5th Drops (Wye & pipe not extended yet) |
End of Run Capped (waiting on Miter Station build w/planner stand, 2connections wyed) |
|
|
|